
ARCHITECTE
Le Riva - Hines France - Neuilly-sur-Seine
_______
Rénovation lourde d'un immeuble de bureaux - Extension partielle. Réfection des façades.
- 7.340 m²
- Bâtiment HQE
________
Heavy renovation of an office building - Partial extension. Recomposition of facades.
- 79.000 sq.ft
- HQE labeling building
26 Garden - Stone Field - Nanterre
_______
Rénovation lourde d'un immeuble de bureaux
Les façades sont totalement déposées, et remaniées. L'identité de la façade principale est repensée.
- Réorganisation importante du hall.
- Coworking sur hall.
- Jardin d'agrément en remplacement d'un parking.
- Création de terrasses à chaque niveau, directement accessible depuis le palier d'ascenseurs.
- Lots techniques neufs.
- Façades neuves.
- Label Breeam.
7.724 m²
________
Major renovation of an office building
The facades are completely removed, and reworked. The identity of the main façade is redesigned.
In addition to this, you need to know more about it.
- Major reorganization of the hall.
- Coworking in the hall.
- Pleasure garden to replace a car park.
- Creation of terraces on each level, directly accessible from the elevator landing.
- New technical packages.
- New facades.
- Maître d'ouvrage : Stone Field.
- Architecte : IF Studio (ad/alterum)
- Breeam label.
- 83.140 sq ft

Tour Alto - Linkecity - Paris-La Défense
_______
Construction de la Tour Alto
- 51.000 m²
- Bâtiment HQE
- Architecte : IF Architectes
(Arnaud DOITEAU Associé responsable du
projet)
________
Construction of the Tour Alto
- 51,000 m²
- HQE building
- Architect: IF Architectes
(Arnaud DOITEAU Partner in charge of project)
En savoir +
IF Architectes
Vigie Sud - Aéroports de Paris - CDG
________
Construction de la tour de contrôle n°2 de Roissy - Doubles vigies superposées - utilisation de verres sans reflet - type Amiran.
- Maître d'ouvrage : Aéroport de Paris
- Maîtrise d'oeuvre : Paul Andreu - A. Doiteau Architecte principal.
________
Construction of the Roissy control tower n ° 2 - Double superimposed lookouts - use of non-reflective glasses - Amiran type.
- Client: Paris Airport
- Project Management: Paul Andreu - A. Doiteau Senior Architect.

Le France - Unibail - Neuilly-sur-Seine
_______
Rénovation lourde d'un immeuble de bureaux - Extension partielle. Réfection des façades.
- 11.550 m²
- Architecte Carlo Maria Natale
________
Heavy renovation of an office building - Partial extension. Recomposition of facades.
- 124.323 sq.ft
- Carlo Mai=ria Natale
Retail - Martek Promotion - Herblay
________
Construction d'un bâtiment de commerces de trois cellules. La clientèle est séparée de l'aire de livraisons, située à l'arrière du bâtiment.
- 3.600 m².
________
Construction of a three cell business building. The clientele is separated from the delivery area, located at the rear of the building.
- 38.750 sq.ft
Transformation d'un entrepôt logistique et Retail - Coignières
________
Au coeur d'un tissus urbain mixte, en concertation avec la ville de Coignières, transformation d'un entrepôt logistique en centre de vie, commerces, cinéma et commerces.
- Maître d'ouvrage : Coignières Logistique
- 18.000 m²
________
At the heart of a mixed urban fabric, in consultation with the city of Coignières, transformation of a logistics warehouse into a living center, shops, cinema and shops.
- Client : Coignières Logistique
- 193.750 sq ft
Lycée de Nangis - Région Ile-de-France
________
Construction d'un lycée polyvalent. Bâtiment en R+1 + CDI au niveau inférieur, la cour. Le projet est organique, et sculptural. Son plan écliptique est une sorte de tulipe, ouverte sur la nature où courbes et angles s'épaulent, pour créer un lieu de vie propre et sans référent.
- Maître d'ouvrage :Région Ile-de-France
- Architectes : JF Laurent & A. Doiteau
- Lycée 800.
- 5.200 m².
- Concours lauréat
________
Construction of a multi-purpose high school. Tow storey building + documentation center on the lower level, the courtyard. The project is organic, and sculptural. His ecliptic plan is a kind of tulip, open to nature where curves and angles are supported, to create a place of life clean and without referent.
- Client: Ile-de-France Region
- Architects: JF Laurent & A. Doiteau
- High School 800.
- 55.970 m².
- Winning competition

Retail / Bureaux - Secyvest - Lodève
_______
Construction d'un bâtiment de commerces sur deux niveaux et d'un niveau de bureaux - Liaison urbaine découpage du programme en deux bâtiments.
Pour des raisons économiques les habillages bois auront été supprimés…
- 4.500 m².
_________
Construction of a retail building on two levels and a level of offices - Urban Link cutting program into two buildings.
For economic reasons the wood trim will have been removed ...
- 48.437 sq.ft
57 Villiers - Macifimo - Neuilly-sur-Seine
________
Rénovation lourde d'un immeuble de bureaux
Le bâtiment implanté de biais par rapport à la rue de Villiers est coiffé d'une toiture en porte-à-faux, alignée sur la rue. Ainsi le bâtiment reprend une identité toute autre, la façade se recompose par strates de deux niveaux. Des ventelles de verre perpendiculaires à la façades captent et brisent les rayons du soleil et au droit de l'entrée de l'immeuble, une double peau en VEA (verre extérieur agrafé) recomposent l'ensemble.
- Maître d'ouvrage : Macifimo
- Projet pour une réhabilitation lourde
- 13.900 m².
__________
Heavy renovation of an office building
The building located at an angle to Rue de Villiers has a cantilevered roof lined up on the street. Thus, the building takes on a completely different identity, the facade is recomposed in layers of two levels. Glass lamellae perpendicular to the facades capture and break the sun's rays and at the entrance to the building, a double skin made of glass clip recomposes the whole.
- Client: Macifimo
- Project for a heavy rehabilitation
- 149.600 sq ft.
Lycée Diderot - Région idf - Paris XIX
________
Concours lauréat pour la construction du nouveau lycée technique Diderot à Paris XIX°. .
- Concours Lauréat
- Architecte : JF. Laurent - A. Doiteau Partenaire.
- 25.000 m².
________
Winning competition for the construction of the new technical school Diderot in Paris XIX.
- Maître d'ouvrage : Région Ile-de-France.
- Winner Competition
- Architect: JF. Laurent - A. Doiteau Partner.
- 269.100 sq ft.
Logements - ADIM - Boulogne Billancourt
_______
Restructuration du site de la sous-préfecture du 92 - Aménagement d'un ensemble immobilier de logements de 21.000 m²
- Architectes IF Architectes
Restructuring of the site of the sub-prefecture of department 92 - Development of a housing complex. 226.040 sq ft
- Architectes IF Architectes
Optimum - GCI - Siemens - Sodearif - Neuilly-sur-Seine
________
Immeuble de bureaux, situé à l'angle de deux rues, détachant une parcelle destinée à des logements sociaux.
- Maître d'ouvrage : Général Continental Investissement - Siemens - Sodearif
- 9.779 m².
________
Office building, located at the corner of two streets, detaching a parcel intended for social housing.
- Client : Général Continental Investissement - Siemens - Sodearif
- 105.260 sq ft.
Nexus II - Ideve - Paris XVII
________
Etude n° III pour le développement d'un immeuble de bureau dédié, au dessus du boulevard périphérique. Situé face à la chapelle Notre-Dame de la Compassion, bâtiment déjà déplacé, notre projet s'efface par l'inflexion de sa façades Sud. Les façades de verre, sérigraphie et maille aluminium anodisé, forment un écrin au programme.
- Développeur : IDEVE Paris
- 14.000 m²
________
Study N° II for the development of a dedicated office building, above the ring road. Located opposite the Notre-Dame de la Compassion chapel, building already moved, our project is erased by the inflection of its south facades. The facades of glass, silkscreen and anodized aluminum mesh, form a jewel on the program.
- Developer: IDEVE Paris
- 150,700 sq ft
Satellite d'embarquement - ADP - CDG2A
________
Construction du satellite d'embarquement de CSG2A - Roissy - 3 postes avions au contact.
- Maître d'ouvrage : Aéroport de Paris
- Maîtrise d'oeuvre : Paul Andreu - A. Doiteau Architecte principal - Chef de projet ingénierie.
- 5.400 m².
________
Construction of the CSG2A boarding satellite - Roissy - 3 aircraft stations in contact.
- Client : Aéroport de Paris
- Project Management: Paul Andreu - A. Doiteau Senior Architect - Engineering Project Manager.
- 8.125 sq ft.
Inpost - Hines - Neuilly-sur-Seine
_______
Réhabilitation lourde et extension d'un ancien immeuble des télécommunications, situé au 66 de l'avenue Charles de Gaulle à Neuilly-sur-Seine.
- Maître d'ovrage : CGW > Hines France
- 5.400 m²
________
Heavy rehabilitation and extension of an old telecommunications building, located at 66 Avenue Charles de Gaulle in Neuilly-sur-Seine.
- Client : CGW > Hines France
- 58.125 sq ft
Retail - Secyvest - Le Passage d'Agen
________
Projet de Retail, constitué de deux bâtiments en construction métallique en zone PPRI.
- Maître d'ouvrage : Secyvest
- 4.588 m²
________
Retail project, consisting of two metal construction buildings in the Flood Risk Prevention Plan area.
- Client : Secyvest
- 49.385 sq ft
Retail - De Vlier - Saint-Nicolas-de-Port
________
Projet de Retail, d'entrée de Ville, depuis l'autoroute A33, faisant une allégorie aux trois besants d'or offerts par Saint Nicolas...
projet non réalisé.
Maître d'Ouvrage : DE VLIER
- 32.000 m²
__________
Retail Project, City entrance, from the A33 motorway, making an allegory to the three besants of gold offered by Saint Nicolas ...
project not realized.
Client : DE VLIER
- 344.444 sq ft
Maison individuelle
________
Projet de maison particulière
- 225 m².
________
Private house,
- 2.422 sq ft.

Retail - Secyvest - Verniolle
________
Construction d'un retail situé dans un ensemble commercial, en développement.
________
Construction of a retail located in a developing commercial complex.
Retail - Secyvest - Montereau-Fault-Yonne
Projet de Retail, constitué d'un bâtiment en construction métallique situé en zone PPRI, le long de l'Yonne.
- Maître d'ouvrage : Secyvest
- 2.999 m²
________
Retail project, consisting of a building in metal construction located in the PPRI zone, along the Yonne.
- Client : Secyvest
- 32.281 sq ft
Retail - France Promotion - BNP Real Estate - Epinal
________
Projet de Retail, constitué d'un bâtiment en construction métallique.
- Maître d'ouvrage : France Promotion
- 4.000 m²
- CDAC obtenue (à l'unanimité)
________
Retail project, consisting of a building in metal construction.
- Client : France Promotion
- 43.055 sq ft
- CDAC obtained (unanimously)